Location
Sevastopol, Crimea
About Depth contest
TEAM (8 PERSONS)
Divers – 6 persons
Team representative – 1 person
Coach – 1 person
STAGES
1. Rescue operation in water
2. Water obstacle course
3. Activity support of a damaged submarine
4. Welding
5. Work in limited space
6. Flange
7. First aid to a drowning man
EQUIPMENT
Type A – hose diving equipment with rigid-shell helmet and boots equipped with breathing equipment, operating on open or ventilated respiratory circuit.
Type B – autonomous diving equipment with full face mask or half-mask for swimming with flippers and with breathing apparatus, operating on open or semi-closed (closed) respiratory circuit.
MISSION
The team consistently overcomes obstacles in water.

ELEMENT 1
The participant is to dive and swim for 20 meters under water, swim for 30 meters free-style, and start conducting the next element.

ELEMENT 2
There is a rotating "drum" which is fixed between the pontoons, the participant swims to it, overcomes the "drum" from above in any accessible way, then floats a distance of 30 meters with a free style and proceeds to the next element.

ELEMENT 3
At a depth of 3-4 meters there is a "dummy" (model of the drowned man), the participant, swam to the buoy (sign), dives and lifts the "dummy" from the bottom and transports it to the pontoon (place of start) at a distance of 10 meters. Finish on lifting the "dummy" and the exit of the participant on the pontoon and the captain's command.

MISSION
Team is to overcome the obstacles in water.
CONDITIONS
• The number of participants – 6.
• Uniform for the exercise – camouflage suit, neoprene shoes.
• Armament – AK-74 simulation device,
cartridge bag with two cartridges for each participant.

The start and finish lines are located no closer than 3 meters from the first and the last obstacle, respectively. All participants start simultaneously. The finish is counted by the last member of the team.

Penalty points are awarded for failure of the participants to assist to each other (in case of the apparent need) while overcoming the obstacles, the loss of items of the uniform, equipment and weapons.
Participants – 1 person
Insuring diver in readiness on a diving post.

1. ENCLOSURE RESCUE EQUIPMENT
Enclosure rescue equipment is located 3 meters away from the start. A diver opens the cubicle with a special key, connects the hose to the fitting of ventilation air in the correct sequence to open the purge valves.

2. TORPEDO-TUBE
The torpedo-tube is located 5 meters away from the start. It is necessary to open the lid of hatch, pawn a deep-water pencil-case inward, to close the lid of torpedo-tube, produce a signal buoy. Exercise is considered executed after arrival of diver to the place of start, emerging of buoyancy from the cubicle and wedging out signal buoy of rescue hatch according to the produced requirements.

1. CUTTING
The diver performs the circle welding of 2 pipes made of 100 mm sheet steel type of low alloy structure for welded constructions in flat position with further sealability testing of the weld by sending oxygen into the pipe.

2. WELDING
It is necessary to perform the work of cutting a predetermined length of the metal corner using a single electrode. The exercise is considered to be accomplished when the judging buoy appears over the surface with a part of the corner.
Number of competitors – 2 persons
Belayer diver is ready on the diving post.

1. PASSAGE OF OBSTRUCTION
A passage of closed compartment is obstructed. It is necessary to deblock the entrance. It is necessary to saw the deck in 4 segments of indicated length that are to be used during the passage through the compartment.

2. RAISING OF COLLAR
Using a collar, a rub strip under a collar is laid on the hole of pipeline by a collar and tightens him the keys with the purpose of subsequent serve of air on a highway.

3. REPAIR OF BROKEN PIPELINE SECTION
Using the 8 screws and 2 layings it is necessary to make two flange connections in the pipeline for further air delivery to the air cushion with the injured person.
4. PATCH SETTING
It is necessary to perform work on the installation of the patch on the hole in the line for subsequent purge line.

5. DEBLOCKING OF THE AIR VALVE
The passage to the air cushion is narrow.

Using hydraulic instrument it is necessary to organize works to expand the passage and fix the construction using parts of the deck. Open the air supply valve to the surface to control the quality of the seal of the holes, and then return through the layout to the finish. Exercise is considered to be performed when air passes through the pipeline and tightness of all the nodes of the layout.

ELEMENT 1
Participant must assemble two flange connections with studs of different diameter, nut screws and gaskets. When assembling the left connection, the participant will need 6 studs, diameter M10, 12 screws of the same diameter and gasket with a suitable number of holes. When assembling the right connections, participant will need 8 studs, diameter M8, 16 screw nuts of the same diameter and gasket with a suitable number of holes.

ELEMENT 2
The participant is to assemble two threaded connections. Threads of different diameters are applied to pipes of the same cross section. It is necessary to assemble the connection with the help of a lever inserted into through holes, perpendicular to the axes of the section of pipes, and used as a wrench.
ELEMENT 3

The participant is to assemble three threaded connections and install a plug. The first bolt (M16 / 50) is installed from the end of the flange with 6 fasteners (right), then the left lower bolt (M12 / 35) and the upper left bolt M8 / 40 are installed. The M8 / 40 bolt must be screwed into the pipe flush so that the plug fits snugly into place. When installing the M16 / 50 bolt, it is necessary to use a knife with a truncated end, since the bolt head has a "flat" groove.
After the completing the assembly of the product, the working diver takes it to the surface to check the correctness of the work of the referee team, then the product descends to the place of assembly (disassembly), the second diver performs his complete disassembly. Cut-off time – from the command "START" to the command "STOP" to check the product for the correct assembly of the referee team and crossing the second diver of the finish line after a complete disassembly of the product. Accrual of penalty points is made by adding penalty seconds for violations (errors).

ELEMENT 1
A driver with 20-meter rope passes through the control points marked by buoys on the bottom and finds a diver in emergency. The diver has to cut the rope twice: before and after the tangled diver, tie both ends with a square knot, and bring the diver to the emergency stairwell.

ELEMENT 2
A victim is extracted ashore without vital sparks. It is necessary to conduct reanimation actions. The victim comes in consciousness, and the signs of damage of bones of pelvis appear for him. The goal is to provide proper resuscitation and transport the drowned to the ambulance at 100 m distance.
PENALTIES
In case of violation of exercise rules and safety regulations the divers are warned, fined and disqualified for a period from one day till total disqualification. If two or more divers of the same team are disqualified the entire team is disqualified from further participation in the contest.
RESULTS
The winners are determined by the maximum amount of points by typing in the three stages of the contest. It the situation with the equal amount of points from one or more teams, the advantage has the team with the best score in the second stage – the Contest for the implementation of underwater technical works.
AWARDING
Awarding of the winners of the contest is carried out:
1. In the individual championship – medals for first, second and third place.
2. In the team event – the cup for the first place of the Contest.

Competition among divers
ARMYGAMES 2016
Best moments of the Depth international contest